You are using an outdated browser version not supported by this website.
Click here to upgrade your browser

Passive Fire Protection in CLT Construction

Plumbing or electrical services that penetrate a CLT panel result in a hole in the fire cell for the service to pass through. The hole for the pipe or cables needs to have a PFP product applied to it to prevent the spread of fire beyond that fire cell.

Read all

22 April 2024
28 April 2020

When Air Leaks Become a Critical Failure Risk: Aquatic Centres

swimming pool

The new aquatic centre was the pride of the council — a shimmering new facility that was meant to keep active people healthy and provide a safe place for kids. But the new council owners noticed odd things about the building as soon as they turned the systems on.

Read all

28 April 2020

Sanitiser or Soap? Building Site Protocols under Level 3

building sites level 3

On Tuesday 21 April, Matthew Duder of EBOSS was joined by David Kelly, CE Master Builders and Chair of Construction Industry Council, as well as Johnny Calley (Calley Homes) as they provided an overview of the new building site standards and protocols.

Read all

28 April 2020

Site Protocols for Architects

site hardhats

What can and can't be done on-site during Level 3? An overview of the new on-site protocols for architects and consultants. 

Read all

14 April 2020

Planning for the Return to Level 3 for Construction and Architecture Businesses

yancy min EzSyFRfNP c unsplash

While no end date for the national lockdown has been set, now is the time for construction and architecture businesses to consider what steps they will need to take to return to Level 3.

Read all

23 March 2020

How Will Architects and Builders Be Affected By the Covid-19 Outbreak?

robert svebeck TNsLQrmTo2Y unsplash

How will work change for you as NZ works to prevent the spread of Covid-19?

Read all

23 March 2020

Specifying for Airtightness and Testing

blow door testing

We hear about better building performance through air tightness all the time. You’ve probably heard you can test for it with a blower door. But if that’s what you want, how do you get it? Here’s some guidance on how to specify for air tightness and a test to prove it. 

Read all

23 March 2020

Seismic Bracing of Suspended Ceilings: Three Common Methods

suspended ceiling fixing options

When it comes to designing suspended ceilings to withstand seismic loads, there are a number of solutions to consider.

Read all

20 February 2020

Sustainable Water Supply

jan kaluza EGBXse9Ub28 unsplash

With the current shortage of rain in much of NZ, especially in the North, it is appropriate to recognise the long-term change in rainfall patterns and to give serious consideration to having water storage for domestic use at most dwellings.

Read all

19 February 2020

Sustainability Will Help Drive Prefab Forward

sustainable coloured bins recycling

The industry needs to work to lessen inefficient delivery of materials, building waste and the movement of the workforce in order to reduce our environmental impact. 

Read all

22 November 2019

2019 Construction Industry Confidence Survey Results

Cranes Auckland

A recent survey of 843 architectural specifiers and 638 builders gives us a snapshot of the NZ construction industry heading into 2020.

Read all

Get a free weekly digest of essential news

New and updated architectural products, design solutions, inspiration, technical advice and more when you sign up for EBOSS.