You are using an outdated browser version not supported by this website.
Click here to upgrade your browser

Passive Fire Protection in CLT Construction

Plumbing or electrical services that penetrate a CLT panel result in a hole in the fire cell for the service to pass through. The hole for the pipe or cables needs to have a PFP product applied to it to prevent the spread of fire beyond that fire cell.

Read all

22 April 2024
26 July 2021

The Future of Green Construction

image002

We're experiencing an ever-increasing strain on the Earth’s limited resources and the impact of Covid-related restrictions on trade and production has shown how volatile the flow of materials is. New Zealand being an island faces its very own challenges when it comes to limited resources. We therefore want to encourage a paradigm shift in how we use building materials  being more aligned with our environment and the people we care for.

Read all

28 June 2021

Utilising Passive House Principles in Warm Roof Design

Ballast Warm Roof copy

With the growing awareness of Passive House principles, we can now illustrate the wider benefits of warm roof design.

Read all

28 June 2021

The Case for Trans-Tasman Building Regulation

AU NZ

When it comes to the building and construction sector, there is a strong case for collaboration and, taking it a step further, a long-term programme to unify as much as possible our building regulatory systems.

Read all

28 June 2021

NZBC H1 Compliance for Domestic Alterations

stephen crowley AxpdKCG po8 unsplash 2 copy

Compliance with NZ Building Code clause H1 (Energy Efficiency) is straightforward for new builds, but for alterations to existing homes it is more complicated and can give unexpected results.

Read all

28 June 2021

When and Where Do You Need a Floor Waste Drain?

Cordis Hotel Bathroom Tile Insert Invisi Drain Floor Waste 3000x1687px

This month's blog post addresses NZBC E3/AS1 Amendment 7 2020/21 covering common scenarios that can be affected.

Read all

24 May 2021

Is It Time for a Fundamental Review of the Building Act and How it is Delivered?

abstract architecture image

Can we develop new compliance pathways for innovations that respond appropriately to the relative risk of non-compliance but in a cost-effective manner?

Read all

24 May 2021

Getting Your Tanking Waterproofing Right, The First Time

allco voltec application mission bay copy

Designing, planning and selecting the right membrane for the conditions of your site are key factors to achieve watertightness on tanking jobs.

Read all

24 May 2021

Planning for Photovoltaic Panel Installations on NZ Homes

solar panel house

For some time now, it has become settled that there is sense in planning for a future where photovoltaic (PV) panels will become a standard feature for new homes and major renovations, even though many owners are not prepared to install them ‘next week’.

Read all

24 May 2021

Five Factors to Consider When Specifying Stormwater Drainage Systems

Commercial Bay - Polymer Concrete Channel with heelproof cast iron grate

The primary objective of NZBC Clause E1 Surface water is to “Safeguard people from injury or illness, and other property from damage”. There are many elements which contribute towards this objective. Outlined are five key factors to consider when selecting the appropriate products for the job.

Read all

7 May 2021

New Acoustic Requirements For The Ministry of Education’s Designing Quality Learning Spaces

acoustic requirements school photo

An outline of the new acoustic requirements from the latest version of the Ministry of Education's Designing Quality Learning Spaces (DQLS) requirements.

Read all

Get a free weekly digest of essential news

New and updated architectural products, design solutions, inspiration, technical advice and more when you sign up for EBOSS.