When a roof is approaching the end of its service life, replacing it before installing solar panels can save significant cost and disruption in the future.
Once solar panels are installed, any future roof replacement usually means removing the entire solar system, carrying out the roofing work, then reinstalling the panels. It's an expense that can often be avoided with a little forward planning.
At 29 Muritai Drive, ACMF is installing a new Western Red Cedar roof while the solar installation is being coordinated to follow. By sequencing the work this way, both trades can do their job properly, resulting in a watertight roof and a solar system installed onto a brand-new roof. The client was really happy with the result.
High-quality roofing isn't just about the finished result. It's about understanding the wider project and working collaboratively with other trades to achieve the best outcome for the client. By coordinating the roofing and solar installation from the outset, the construction programme runs more efficiently, duplication of work is reduced, and the client avoids the unnecessary cost of removing and reinstalling solar panels in the future.
Solar panels are designed to last for decades. Your roof should be too.


















