You are using an outdated browser version not supported by this website.
Click here to upgrade your browser

Passive Fire Protection in CLT Construction

Plumbing or electrical services that penetrate a CLT panel result in a hole in the fire cell for the service to pass through. The hole for the pipe or cables needs to have a PFP product applied to it to prevent the spread of fire beyond that fire cell.

Read all

22 April 2024
26 September 2013

Auckland Council Unanimously Support Auckland Housing Accord

Finally Nick Smith gets support from Auckland City regarding the Auckland Housing Accord.

Read all

20 August 2013

Using More Renewable Resources in Design

In a country whose economy thrives off being labeled 100% pure, why aren’t we taking more advantage of our natural resources?

Read all

10 August 2013

Specifying Steel Framing

Steel framing is a growing trend and as such it's important the right people get the right information to ensure the integrity of the product arriving on site is not compromised due to a lack of knowledge or inappropriate design solutions.

Read all

8 August 2013

Sketchfab Brings 3D Visualisation to the Web

With the increase in 3D design, it's no wonder services like Sketchfab are popping up. Claiming they will do to 3D visualisation what Youtube did for video, Sketchfab provides a simple service to enable designers to publish, share and embed their files in a visual and interactive way on any website.

Read all

29 July 2013

Design Guidelines for Glazed Internal Partitions

Some of our most frequently asked questions relate to limitations of glazed internal partitions.

Read all

15 May 2013

Four Ways To Solve Noisy Spaces

There is more than one way to reduce noise in interior spaces.

Read all

3 April 2013

Fire-Rated Systems Using Scyon Stria Cladding and RAB Board

With the changes to the NZBC regarding fire protection becoming mandatory on 10 April, I've been fielding lots of inquiries about fire-rated systems using Scyon Stria and RAB Board.

Read all

25 March 2013

Privacy in Washrooms: Acceptable Solutions G1/AS1

In March MBIE published further explanation around the design of commercial toilets to further elucidate the design of toilet layouts for commercial building, adequate privacy and line of sight and accessible toilet layouts.

Read all

12 March 2013

Are Retentions Protection for the Client or a Main Contractor Rort?

Once again there has been an unsignalled collapse of a construction company, and once again I go to my AR ledger to calculate the damage.

Read all

8 March 2013

Simple STC Solution: A Staggered Stud System

Recently an architect was looking at a ‘staggered stud’ wall system for an office fitout project – which was recommended by an acoustic technician to achieve a high STC-rated wall. The architect wanted some level of confidence in how this type of system goes together.

Read all

Get a free weekly digest of essential news

New and updated architectural products, design solutions, inspiration, technical advice and more when you sign up for EBOSS.